Milestone:

Major Goals

Dependencies

Rough Timeline

Frame welded

Frame validated and ordered

  • Driver dimensions taken

  • Seats molded

  • Frame Design drafted

  • P

    Deadline

Pedal box assembled

Drivers set in stone, driver model created, pedal design validated and ordered

Chassis width decided

Dynamics geometry decided

Dynamics

Major Goals

Dependencies

Rough Timeline

Onboarding/Training

Recruitment

  • Training: 10/12/24

  • Preliminary Designs: 11/9/24

  • Final Designs Ideally: Before we leave for winter break

  • Final Desings FINAL: 2/15/25

  • Manufacturing Begins: 2/22/25

  • Manufacturing Finished: Before start of winter break of 2025

  • Integration starts depending on other systems

Trackwidth decided

Volumetric bounding box decided

Unsprung components assembled

Suspension components assembled

...

Major Goals

Dependencies

Rough Timeline

Volumetric bounding box decided

  • Milestone: Deadline

Battery pack design decided (to start battery box design)

Overall wire harnessing diagram complete

Driver cooling design complete

Motor controller cooling design

✅ Action items

  •