Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Time

Item

Who

Notes

5 Mins

Introduction

Pratyush Patra

Trial Workday Plans

Pratyush Patra

  • How is everyone fitting?

    • Non trial workday members will wfh basically

  • What is our timeline breakdown and what do you wanna do?

    • Every one will have a presentation

    • 1:45-2:00 Min welcome to electrical blah blah blah

    • 2:00-2:10- System presentations

    • 2:15-2:35 BPS, PS, Controls see car and battery

    • 2:40-3:00 PG, DAcq see car and battery

    • Systems not showing car finish presentations and icebreaker

    • Swap at 3 for members who need to swap

    • 3:15-4:30

    • 4:30 be nice and friendly as we wrap up(brawl)

  • How are we facilitating people moving around?

    • Swap at 3ish but after we do the electrical competition

Daybreak Updates

Everyone

  • What is status on projects? Who is doing what?

  • Contactor Driver- September 28th(Twins) Ordered EOD September 21st

  • BPS Scrutineering- September 28th (Lakshay)

  • BPS Fan Board- September 28th (Lakshay)

  • Dashboard PCB- November 16th (New Member)

  • Controls Rework- November 16th (Maddie and Krish)

  • New MPPTs- ASAP(Andrew and I and Ops)

  • Debug the old controls backup(Lakshay, Prat, Diya, Nathaniel, whoever else wants to)

  • Power Board- December 7th(Frank and Carogoat)

  • Motor 😢

Next Car Updates

Everyone

  • SOM and Sharepoint updates?

    • Design should be locked to order PSOM

    • Start on LSOM

    • Assign members to sharepoint stuff ASAP there's been like no progress

    • BSP verified by Spring Break

  • Daughterboards deadline? I like how Nathan is doing Amperes and would like that sort of documentation happening. Are requirements for boards clear enough or should that be something filled in on Philips doc by members or should it be filled by us? How are members making sure they are clear on the expectation of what their boards must do?

    • Just add daughterboard deadlines for those that get assigned on clickup. I want to do the first mass order of daughterboards when we leave for winter break so we have them to test when we are back.

    • Requirements template doc for new members like Nathan(Anirudh)

15 Mins

Onboarding

Everyone

  • Bruh

  • Need to Electrical presentation, Hardware, Software

  • Make confluence doc for resources for all this stuff

5 Mins

Culture thing

Pratyush Patra

Discussion Notes

...

10 MIns

Design Reviews

  • October 5th- Battery

  • October 12th- Power Architecture

  • October 19th- Sensor Sutie

Discussion Notes