Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Time

Item

Who

Notes

5 Mins

Introduction

Pratyush Patra

 

 

Onboarding plan

Pratyush Patra

  • What are all of you going to be giving to members during your system specific thing? KiCAD, git stuff, vscode stuff? Are you making presentations?

    • BPS- What boards? How boards communicate? RTOS? STM? OpenOCD and GDB? Voltage? Pictures? How BPS interacts w the rest of the car? KiCAD, vscode/WSL, git

    • PS- What boards? HV diagram? Battery layout? Contactor, precharge, dcdc converter? KiCAD, vscode/WSL, git

    • PG- Introduce members, System-level vocab, Present all projects in depth, KiCAD, vscode/WSL, git

    • DAcq- Architecture, Projects, IMU full stack, KiCAD, vscode/WSL, git

    • Kontrols- System diagrams from daybreak and new car, regs, software stack, projects, daybreak upkeep, KiCAD, vscode/WSL, git

  • What should go in the big electrical presentation? My thoughts

    • Welcome hi hello introduce leads again, join github

    • Our old systems/contextualize where we are as a division

      • Talk about daybreak briefly but not architecture stuff

      • talk about comp and how comp went. what is the goal of comp

    • Our new system architecture

      • Talk about what systems are doing frmo a high level, CAN

      • Talk about SOM and sharepoint from a high level, What MCU we use, Contactor

      • Discuss briefly why we made the decisions we did

    • Our design practices

      • Emphasis on organized and documented decision making. Incremental project goals. High-level when we want to finish stuff

    • Culture stuff to make them feel welcome

    • Homework project?

      • Fan Board doc

  • New hire doc

  • KiCAD setup doc

 

Daybreak Updates

Everyone

  • What is status on projects? Who is doing what?

  • Contactor Driver- September 28th(Twins) Ordered EOD September 21st

  • BPS Scrutineering- September 28th (LakshayPratshay)

  • BPS Fan Board- September 28th (Lakshay)

  • Dashboard PCB- November 16th (New Member)

  • Controls Rework- November 16th (Maddie and Krish)

  • New MPPTs- ASAP(Andrew and I and Ops(PARTHIV I NEED MPPT))

  • Debug the old controls backup(Lakshay, Prat, Diya, Nathaniel, whoever else wants to)

  • Power Board- December 7th(Frank and Carogoat)

  • Motor 😢

 

Next Car Updates

Everyone

  • SOM and Sharepoint updates?

    • Design should be locked to order PSOM

    • Start on LSOM

    • Assign members to sharepoint stuff ASAP there's been like no progress

    • BSP verified by Spring Break

    Daughterboards deadline? I like how Nathan is doing Amperes and would like that sort of documentation happening. Are requirements for boards clear enough or should that be something filled in on Philips doc by members or should it be filled by us? How are members making sure they are clear on the expectation of what their boards must do?

    • Just add daughterboard deadlines for those that get assigned on clickup. I want to do the first mass order of daughterboards when we leave for winter break so we have them to test when we are back.

    • Requirements template doc for new members like Nathan(Anirudh)

15 Mins

Design Reviews

Everyone

  • Imma post the dates in electrical

  • October 5th- Battery

  • October 12th- Power Architecture

  • October 19th- Sensor Suite

  • UTSVT fix

  • BUY ORGANIZERS

Discussion Notes