    Meeting Notes:

    • Two real workdays left before Thanksgiving Break

    • Concern about part-level design and progress thus far to thanksgiving break

    • PDR is Jan 18, the first Saturday after we return from winter break

    • We only have a limited amount of time until the break, it’s come to the point where we will probably have to do work over the break

    • Naming convention is a real concern right now the longer we wait to fix it the harder it will be to fix. Leads and sub leads must take initiative on this

    • Advait Joshi needs to clutch up on Statics

    • System updates:

      • Unsprung, in talks with calipers, bearings need to be set, haven’t looked too far into sensors. Might not have caliper selection determined by this week, still needs validation in order to make a selection. Preliminary design of hub+ spindle design by the end of this week. Projected date of selection is to have it done by the end of Thanksgiving break.

      • Steering ackerman geometry and sterring linkage hasn’t been selected. Steering geometry update: they have a position but they need to test it for bump steer, needs to validate with better values, needs to utilize/refine Jacob’s code. Came up with an issue with where the rack bounding box will be placed relative to ergo and front axle

      • Roll cage needs to be finalized by end of week (11/16)

      • PDR - CADs need to be made, general geometry is made,critical mounting points need to be fixed (belly pan tabs, etc)

      • Ergo next-gen pedal box design needs to start

      • Shell to frame may need to have by PDR

      • Shell to shell interface may also need to have by PDR

      • Geometry issues with the shell with simming the current shell

    • Workday Review

      • Dynamics

        • Manas and Johnnathen on trailing arm geometry

        • Steering 3D sketch of geometry

        • Concern with location of steering rack and ergo bounding box

        • hash out a plan for FEA

      • Aerodynamics

        • Teaching Ansys

        • Simming approach

        • goal is for everyone to have a sim done on the parts they have

        • Composites: battery box layups

        • composite test fixtures and resin infusion

      • Body

        • Driver model can be finizaled

        • frame first iteration done

        • how to integrate the composite sandwich panels and tubes together

        • Good work on the steering designs for next-gen and daybreak

        • Body

          • test setups need to be setup with current frame iteration

          • comtune work with sgeering wheel design

          • design and testing o pedal jig

          • starting work on nect=gen seat utlizing data from ergo jig