Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

6/4/2023

1) The 3T Prisma system arrives on campus.

2) Equipment cabinets being hoisted into the BIC suite.

Image AddedImage Added

3) The Prisma begins its journey into the BIC.

4) The system is positioned above the access shaft, and 5) arrives in the Center.

Image AddedImage AddedImage Added

Timelapse of the Prisma being rigged into the NHB basement.

6) The system is skated into the Scanner Room.

7) Prisma in position.

Image AddedImage Added

...

5/19/2023

1) NHB access shaft from below, ready for the Skyra to be rigged out of the basement MRI suite

...