Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

2.0 assessment : phased approach - needs (first pass, then via shelf list work). Needs specific - see /wiki/spaces/apl/pages/80156420 for specific needs under Space Planning and Collections Management

  • collection material - need primary containers
    • conduct supply needs assessment

ex. RPS drawings located at btl3 dcw4, top 3 shelves need enclosures and primary description (may just be wrapped with a roll #)

  • collection material - need primary description (container label with collection code and unique #)
    • must be documented on shelf list and then one of the following: provisional finding aid, receipt inventory
  • collection material - preservation and/or access needs
    • identify special packing & handling needs- mark container accordingly
    • identify containers that are mostly processed (rehoused and have folder labels), but have no listing on the finding aid.  Enhance EAD if possible.


3.0 packing, handling and transportation to temporary/perm offsite locations???  when will Geoff need this by?

  • swing locations (as of 9/2/19):
    • AAA (most likely at CDL)
    • APL SPEC (most likely at CDL)
    • APL general collections (TBD)


4.0 return plans TBD

  • what goes where?


Draft working space

archives : stx1

...