Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Attendees

Goals

  • System Architecture Proposal Presentation

  • Timelines

Discussion Agenda

Time

Item

Who

Notes

5 Mins

Introduction

Pratyush Patra

 

 

Pratyush Patra

 

Daybreak Updates

Everyone

  • What is status on projects? Who is doing what?

  • Contactor Driver- September 28th(Twins)

  • BPS Scrutineering- September 28th (Pratshay)

  • BPS Fan Board- September 28th (Lakshay)

  • Dashboard PCB- November 16th (New Member)

  • Controls Rework- November 16th (Maddie and Krish)

  • New MPPTs- ASAP(Andrew and I and Ops(PARTHIV I NEED MPPT))

  • Debug the old controls backup(Lakshay, Prat, Diya, Nathaniel, whoever else wants to)

  • Power Board- December 7th(Frank and Carogoat)

  • Motor 😢

 

EOD Goals

Everyone

  • Controls

    • Zoe- Pedal Board, Requirements

    • Lucy- Lighting Board, Requirements, Not here this workday

    • Jiwoo, Arnav- Motor

    • Maddie and Krish- Leaderboard

    • Akshay- Camera system diagram, Cameras chosen

    • Oscar- Motor

    • Eliana- Dashboard

    • Mika- Starter project

  • BPS

    • Nathan- Schematic done for ADC subcircuit, current sense circuit

    • Aneri- Address reviews for SPI

    • Michael- BPS Leaderboard Makefile

    • Clark- BPS Leader, Requirements*

    • Abigail- Supp Monitoring, Requirements

    • Phoenix- Contactor App, Software Diagram

    • Lakshay- PSOM done or else death

  • Power System

    • Carolyn- Power board scheme done eod

    • Twins- ESP32 devboard research, Which esp/is it viable

    • Watts and Changxu- BBPDU schem

    • Kaden and Bosa- Reqs for Power monitoring board

    • Jacob and Tony- Active Precharge discussion first

    • Shaun- BSP GPIO, Every function and how it will work, Software diagram? EOD. Draft PR with header file by EOW(before next workday)

    • Ravi- the avatar, Reqs for DAcq Environment Board

  • DAcq

    • Matthew- XBee subcircuit done EOD

    • Jim- BSP_UART, Every function and how it will work, Software diagram? EOD. Draft PR with header file by EOW(before next workday)

    • Rohan- gametime

    • Lance- gametime

    • New members- Starter projects

  • Array

    • Tanya- Blackbody i2c system design, EOD

    • Aarav- Blackbody C, Reqs, EOD

    • Aleena- Timeline for MPPT project, subdeliverables

    • Erika- In flux, Intro project review

    • Isaac- In flux

    • Nash- Code done for Data pipeline by EOD

    • Nikhil- Flashing model on the microcontroller

    • Connor- Database

    • Praneel- Firmware for MPPT, Software System Diagram EOD and review by Ishan

  • Prat

    • Contactor driver ordered, fan board ordered, scrut board ordered, PSOM ORDERED EOD

15 Mins

Design Reviews

Everyone

  • Imma post the dates in electrical

  • October 5th- Battery

  • October 12th- Power Architecture

  • October 19th- Sensor Suite

  • UTSVT fix

  • BUY ORGANIZERS

Discussion Notes

  • Requirements for hardware- Include relevant regs, component selection, statement of purpose, electrical interfaces(wire harnessing), physical interfaces(enclosures), other ways you could do it and why you didn’t, Talked to an electromechanical, differences from old boards