Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

This change log is to be utilized when changing the main frame reference sketch and weldment part file

Change Date

Brief description of what was changed

Who made the change? (who to contact if there are problems)

Visual of Change

Ex: 10/26/24

Ex: Frame reference sketch started, front crash structure and suspension hardpoints started

Ex: Josh

Insert image here

11/26/24

  • Roll hoop made larger to fit driver bounding box

  • Removed back RH bracing

  • Added additional rear RH bracing

  • Some bottom tubes combined to straighten load paths

  • Upper tubes combined to straighten load paths

  • Front and rear HDPT updates

Josh

image-20250105-233123.pngImage Added

image-20250105-233655.pngImage Added

1/2/25

  • Roll hoop made smaller for aeroshell to accomidate changes to driver bounding box (canopy being too large)

  • Raised rear to accomidate changes to rear shock mounting point

  • Shortened front to accomidate changes to pedal box bounding box

  • Removed some floor cross tubing

  • Front and rear HDPT updated

Josh

image-20250105-233655.pngImage Addedimage-20250105-234012.pngImage Added