7/31/2023
1) Our new 3T Siemens Prisma system - installed and calibrated.
2, 3) The first sets human brain images have been acquired.
3,4) The corridors are now open-plan throughout the Center and office-space for BIC staff has been refurbished.
5,6,7) The space under the drop-zone has been finished out with flexible lab / interview room spaces.
...
7/14/2023
1) The 3T Prisma system installed just prior to ramp to field.
...
3) Paving stones have been re-laid on the NHB patio, covering the location of the access shaft.
...
67/414/2023
1) The 3T Prisma system arrives on campus.
...