7/31/2023

1) Our new 3T Siemens Prisma system - installed and calibrated.

Image Added

2, 3) The first sets human brain images have been acquired.

Image AddedImage Added

3,4) The corridors are now open-plan throughout the Center and office-space for BIC staff has been refurbished.

Image AddedImage Added

5,6,7) The space under the drop-zone has been finished out with flexible lab / interview room spaces.

Image AddedImage AddedImage Added

...

7/14/2023

1) The 3T Prisma system installed just prior to ramp to field.

...

3) Paving stones have been re-laid on the NHB patio, covering the location of the access shaft.

...

67/414/2023

1) The 3T Prisma system arrives on campus.

...