Skip to end of metadata
Go to start of metadata
Attendees
Goals
Discussion Agenda
Time | Item | Who | Notes |
---|
5 Mins | Introduction | Pratyush Patra | |
| Onboarding plan | Pratyush Patra | What are all of you going to be giving to members during your system specific thing? KiCAD, git stuff, vscode stuff? Are you making presentations? What should go in the big electrical presentation? My thoughts Welcome hi hello introduce leads again Our old systems/contextualize where we are as a division Our new system architecture Talk about what systems are doing frmo a high level Talk about SOM and sharepoint from a high level Discuss briefly why we made the decisions we did
Our design practices Culture stuff to make them feel welcome Homework project?
New hire doc
|
| Daybreak Updates | Everyone | What is status on projects? Who is doing what? Contactor Driver- September 28th(Twins) Ordered EOD September 21st BPS Scrutineering- September 28th (Lakshay) BPS Fan Board- September 28th (Lakshay) Dashboard PCB- November 16th (New Member) Controls Rework- November 16th (Maddie and Krish) New MPPTs- ASAP(Andrew and I and Ops) Debug the old controls backup(Lakshay, Prat, Diya, Nathaniel, whoever else wants to) Power Board- December 7th(Frank and Carogoat) Motor 😢
|
| Next Car Updates | Everyone | SOM and Sharepoint updates? Design should be locked to order PSOM Start on LSOM Assign members to sharepoint stuff ASAP there's been like no progress BSP verified by Spring Break
Daughterboards deadline? I like how Nathan is doing Amperes and would like that sort of documentation happening. Are requirements for boards clear enough or should that be something filled in on Philips doc by members or should it be filled by us? How are members making sure they are clear on the expectation of what their boards must do? Just add daughterboard deadlines for those that get assigned on clickup. I want to do the first mass order of daughterboards when we leave for winter break so we have them to test when we are back. Requirements template doc for new members like Nathan(Anirudh)
|
15 Mins | Design Reviews | Everyone | Imma post the dates in electrical October 5th- Battery October 12th- Power Architecture October 19th- Sensor Suite
|
Discussion Notes