  • Weekly progress check

  • PDR Progress Check

\uD83D\uDDE3 Discussion topics

Item

Notes

Announcements

  • There are two workdays left until the end of the semester

Highlights

PDR Progress Check

Dynamics

Body

Electromechanical

Aeroshell

Suspension

  • Suspension Type Selected
  • Hardpoints Finalized
  • Shock Selected
  • Shock-Pot Mounting
  • Motion Ratio, Spring Rate determined

Frame

  • Bounding Boxes Finalized
  • Roll Cage Finalized
  • Passing Frame Sim
  • Preliminary Tab Placements

Battery

  • Battery Layout Finalized

Aerodynamics

  • Top Shell Finalized
  • Initial Shell to Frame
  • Shell-to-Shell Options
  • Preliminary CFD Results
  • Pitot Tube Mounting

Unsprung

  • Brake Calipers Selected
  • Wheel Bearing Selected
  • IMU, Hall Effect Mounting

Enclosures

  • Enclosure Mounting Locations
  • Number of Enclosures Fixed
  • Waterproofing Plan

Steering

  • Rack Selected
  • Ackerman Geometry Finalized
  • Upper Steering Linkage Power Transmission Chosen
  • Pot Mounting

Ergo

  • Preliminary Pedal Box
  • Driver Position Fixed
  • Preliminary Brake Routing Diagram
  • Steering Wheel Design
  • Ballast Location

Cooling

  • Cooling Strategy Selected
  • Rough Routing Scheme
  • Battery Thermal Testing Results

Composites

  • Research Results (short presentation)
  • Mold Reference Scheme Selected
  • Manufacturing Plan

Wire Harnessing

  • Preliminary Wiring Diagram

Dynamics:

Aeroshell:

Body:

Emech:

Updates/Blockers

Please update me on the progress you’ve made the past week. Do you have any blockers?

Workday Review

  • drivers sized → driver model can be finalized this week

  • first frame iteration finished → simming to begin

  • initial composite research finished → sandwich panel design and mount design next

  • steering wheel designs (daybreak and nextgen started)

  • critical hardware back in car and harnessed

  • mock cooling intake to send to regs

Next Workday Plan - please break tasks down into sub-tasks

  • start simulating frame → get initial data for first iteration

  • create initial design ideas for frame jig

  • continue working on steering wheel designs

  • finish up daybreak pedal box changes (test pedal jig, finish design)

  • start work on next gen seat

  • manufacture mock module

  • characterize a few battery cells and bin

  • have all battery box panel cutouts finished and dxfs created for waterjet

    • only layups will be a blocker then

Daybreak Progress?

  • Created a preliminary design (CAD model) of the radial tubular intermediate steering shaft constraint

nah

  • made intake mock before finalizing to get checked by steve and dan

  • car can drive theoretically

    • need to pump tires

Questions people want to ask:

  • for daybreak → need master cylinders from car to test new pedal ratios and setup, so when can we take them off daybreak?

What do you need from me this week?

✅ Action items

  •  

⤴ Decisions