Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

\uD83D\uDC65 Attendance

  • Michael Mohn
  • Philip Bortolotti
  • Hardhik Sripuram
  • Gerard Cardenas
  • Pratyush Patra
  • Diya Rajon
  • Lakshay Gupta
  • Andrew Yin
  • Pablo Romero
  • Frank Li
  • Parthiv Shah
  • Noah Hickman
  • Harshit Dalmia
  • Jason Heston

📝 General Updates

💸 Operations

Updates

CR

  • Annika

    • working on getting the oscilloscopes (need purchase update from y’all)

    • tentative ship date for the transducers is 12/12

  • Niloo

    • Working on cowtown materials for massive foam blocks

    • still on the hunt for solar cells and stuff (need some responses from Andrew)

    • Working on smaller foam machiners

  • Arav

    • brakes and stuff, not much from him yet

  • Jackson

    • Mainly monetary right now

PR

  • Big things to come with ePlan

    • bi-weekly videos with their production team for mini-series

    • USA President and Global President slated to attend unveiling

      • hopeful unveiling partners

    • We need to begin using the software so that we can get into using the stuff for videos

      • these videos will be on ePlan website and socials and we can use as well

      • PR team will begin working on this starting our workday

🛠️ Chief Engineer

✅ Previous Action items

  • Andrew gonna motivate (smile)
  • i wanna talk with aeroshell
  • i wanna talk with gerard/diya/parthy
  • power gen new lead
  • Rectangular vs Curved top shell FEA done by workday

\uD83D\uDDE3 System Updates

🚨 Controls:

Updates

  • Motor Controller STILL isn’t working (no more CAN Issues tho)

    • Parthiv can say more abt this

    • Don’t think this is from Controls side, need to verify.

  • Three more members know how to use profinity/set up + debug

  • Maddie and Krish - Layout in progress

  • Lucy - Lighting schematic draft reviewed

  • Oscar - Leader Dash, SendTriitum

  • Mika - Addressing Parthiv’s ideas on dashboard, addressing pedals board accel sensor

Week Plan

  • meeting with Eliana Thursday to look at brakeline for board

  • I intend to stay on campus throughout break to catch up on whatever work is behind (after 5 PM everyday): pedals board, MC fix if possible, ordering, finalizing with dash etc.

Upcoming Deadlines

Pedal needs to have first draft completed EOW.

🔥 BPS:

Updates

  •  Boards are developing

  • Michael tested his watchdog on hardware but there’s some weird stuff going on, will be starting RTOS stuff soon

  • Phoenix is testing her RTOS stuff on a Nucleo now

  • Aneri got SPI running on Nucleo and is working on it over break

  • Clark is pretty close to starting layout and I think he can get it done pretty quickly

  • Abby is also pretty close to starting but she needs to address comments on the schematic

  • Progress on Amperes board is kinda slow, if it conitnues to be slow I’ll starting adding more help

Week Plan

 

Upcoming Deadlines:

  • 11/09/26 - BPS Software Architecture

  •  

 

⚡ Power Generation:

Updates

  • Accepted quote for MPPT

  • Tanya and Tong about to send review request

    • Constant current lighting driver schematics

    • Temperature sensor schematics

  • Erika started ADC breakout boards layout

Week Plan

  •  

 

Upcoming Deadlines

  • 12/16/2024 - Order boards

  • 01/19/2024 - Array x Mechanical PDR

 

📻 Data Acquisition:

Updates

  • Weather + Array + Battery + Terrain all integrated. Working on simulating dynamics.

  • RF Receiver schematic complete. Working on layout

  • IMU/RPM board schematic complete. Working on layout.

Week Plan

  • Give thanks to the people that have given us so much

Upcoming Deadlines

- RF Board Layout

- IMU/RPM Board Layout

 

🔋 Power Systems:

Updates

  • Power board layout complete. Waiting on review. Reviews will be addresed prior to thanksgiving break and ordered by the same deadline.

  • Contactor driver and dataacq env board ordered.

  • eFuse testboard ready for review. Will be ordered alongside power board

  • Good progress on env board software (reading humidity and temp values on terminal).

  • Active precharge board undergoing a slight change (changing power delivery from LDO to buck). Finished and awaiting review.

  • Power monitoring board sch reviewed. Layout will start soon.

  • Encountered some issues when trying to spotweld on sigmaclad. Reached out to Kevin Yu (electric) with observations and questions. Havent recieved a response just yet.

Week Plan

  • Continue battery manufacturing (spotwelding) testing

  • review active precharge and eFuse testboard.

  • We also try out hand at the challenges placed before us. But we do it better. 😎

 

Upcoming Deadlines

  • - Power Board Layout
  • - Order Power Board
  • - Order eFuse testboard
  • - ESP32 Batt Char board sch
  • - Power Mon board layout
  • - Active Precharge layout

🔌 Electromechanical:

Updates

  • Started on Eplan

  • spot welding problems, going up sometime this week to hopefully get test module built

  • battery box locks finished with fea completed as well

Week Plan

design review for final cooling parts before we come back

complete mppt and motor controller cooling

 

Upcoming Deadlines

  • Dec 4 - MPPT and MoCo Enclosures

 

🧑‍🏭 Body:

Updates

  • Frame 1st iteration had to be redone

  • Jig Design plan and Welding order started

  • Pedal Jig used, pedal ratio was tested and confirmed for daybreak pedal box redesign

  • Steering Wheel layup setup tested, CFC viable for steering wheel construction, needs some refinement

Week Plan

  • Go over welding theory to help with jigging/welding plan

  • Re-finish 1st frame iteration, start ansys sims

  • Decide pedal box placement/bounding box

  • Continue work on Daybreak pedal box redesign

 

Upcoming Deadlines

  • Nov 16, 2024 - Roll cage position/dimensions set
  • Nov 16, 2024 - Driver Model finalized
  •  

🔩 Dynamics:

Updates

  • General:

    • Manufactured inserts for composite testing

  • Unsprung:

    • Decided brakes

    • CAD for rear a-arm structure

    • Sohan began learning manufacturing with me and Gerard

  • Suspension:

    • Talked with fergo to better understand bounding boxes and HDPTS need to be changed

    • All members got Ansys installed

    • Carter is doing finding the loads related to bell cranks

    • Oliver and La’akea began learning manufacturing with me and Gerard

  • Steering:

    • Found lower steering rack geometry

 

Week Plan

  • Unsprung:

    • More mockup designs for both front and rear

    • Break button dimensions and forces on the rotor when we lock up

  • Suspension:

    • First iteration rear reference sketch

    • Load conditions for suspension focusing on bell cranks

    • Oliver and La’akea testing pushrods

    • Test with dummy suspension

  • Steering:

    • Reviewing lower steering rack geometry

    • Members work on designs for upper steering, figuring out how gearbox will work

 

Upcoming Deadlines

  • - Brake calipers and rotor size decided (Arav got us this data) - Unsprung
  • - Upper steering architecture selected (is in talks with ergo and suspension)- Steering
  • - Bump steer design optimization - Steering
  • - Version 1 of Upright design in CAD - Unsprung
  • - Finalize brakes and rotor config (Arav got us this data) - Unsprung
  • - Caliper and motor mount for Swingarm - Unsprung + Suspension
  • - Decide bearings - Unspung
  • - Version 1 of Hub design in CAD - Unsprung
  • - Suspension Geometry Finalized - Suspension

💨 Aeroshell:

Updates

  • Aerodynamics

    • Finished up designs for each members respecitve parts

    • Matthew sims lecture pt 2

      • getting through sims for most parts

  • Composites

    • Battery box layup, metal sheet, resin calculator sheet, test fixture for shear test designed and now its bad

    • Niloo found a company that can may be able to make us a foam mold for bottom shell for mold release testing (working on getting a quote rn)

 

 

Week Plan

  • Aerodynamics

    • Prep sims by meeting, throw em in TACC during meeting

    • hopefully theyve picked what design they want to put on the final car by the end of break

  • Composites

    • advait going to live at pickle over thanksgiving break, finish daybreak prep and battery box layup

    • jaden going to recad test fixture

    • first composite insert bonding test on thursday

    • Do post processing for first fcf test, figure out all changes that need to be made to fix it/ what vars we want to mess around with

 

Upcoming Deadlines

  • Nov 20, 2024 - aerodynamics members have sims prepped
  • - Battery box layups + Kaden's test panel complete
  • - Daybreak shell prep complete and ready for shell to frame attachment

✅ New Action items

  •  

⤴ Decisions

    • No labels