1) The Invoice number comes from the lending institutions paperwork. It can be an invoice number or loan number.
2) This is the due date taken from the invoice
3) If the borrower requests an extension, check this box
4) We won't accept loans that put the financial responsibility on this lab, so don't worry about this.
5) The date the package was delivered
6) This is the same as the Original Due date. If an extension is requested, then this date gets changed
7) check this box when you send the material back to the lender
8) This is the date the material was shipped back to its home institution