\uD83E\uDD45 Goals

  • Discuss SRR takeaways and identify key action items to move forward

  • Discuss PDR and CDR objectives and timeline

  • Narrow down the general architectures we are pursuing for the next-gen car

  • Discuss Daybreak Progress

...

Dynamics:

Aeroshell:

Body:

Emech:

SRR Key Takeaways

https://cloud.wikis.utexas.edu/wiki/x/LwdtD

Overall

  • we need to define how we are going to do reference points on the mold, and confirm that the knowledge is transferred

Aerodynamics

  • We need to solidify the plan for splitting up work and creating different parts of the shell(nose, tail, how to we avoid it messing up the overall geometrey)

  • Talk about roll cage in an intersystem meeting, because thats the next big thing that defines what we do

Composites

  • Figure out design of windshield with respect to the polycarb and what materials we should use

  • LOTS of wesley notes, not worth putting all in this spot since its lot of smaller specific notes

  • resin infusion is a risk and will cost a lot of money (vacuum)

  • consider having aeroshell PDR at the same time as dynamics and frame CDR

Body SRR Takeaways

https://cloud.wikis.utexas.edu/wiki/x/i4V4D

Action Items

  •  Setting suspension hardpoints
  •  Determining ride frequency, spring rate
  •  Identify operating conditions
  •  Upright bearing selection
  •  Brake caliper selection
  •  Shock absorber selection
  •  Identify operating conditions
  •  Completion of composite testing plans with timelines and purchasing sheets
  •  Have roll cage meeting with body
  •  Suspension hardpoint widths for Dynamics
  •  Identify driver position
  •  Have roll cage meeting with aeroshell
  •  Identify nextgen battery box dimensions
  •  Establish plan for cooling calcs and testing/measurements
  •  Set RMS Current value
  •  Cell characteriationcharacterization (Dr Subramanian's lab)

System

Architecture

Dependencies

Pros

Cons

Dynamics

Trailing Arm

Frame

Body

Aeroshell

Emech

Single Battery

Frame - bounding box, potential locations, mounting points

Shell - Where can the battery be removed from

Split Battery

Frame - bounding box, potential locations, mounting points

Shell - Where can the battery be removed from

Size

Frame - bounding boxes

Regs - number of cells

Ducts

Aeroshell - intake/exhaust holes

Frame - Routing

Dynamics:

Aeroshell:

Body:

Emech:

Weekly Updates

  • Need to do more daybreak work

  • Might need to redo/rethink some of the cooling solution due to new regs

  • Adjust module mounting and bus bar location since we are removing load from midpanel

Daybreak Progress

  • Extending daybreak controls arms by 2

  • BPS and Contactor layout complete

  • Main enclosure complete, need to add mounting locks and roller wheel

  • Dashboard layout and connections finalized - controls has v1 done, waiting for review and order

  • Opened up battery and identified broken modules. Prat and Frank will have ppl go up and start fixing it to start motor testing.

  • Driver cooling (on dashboard) design finished

Questions people want to ask

What do you need from me this week?

✅ Action items

  •  Philip go to dynamics meeting to discuss sensor

⤴ Decisions