\uD83D\uDDD3 Date


\uD83D\uDC65 Attendance

  •  Michael Mohn
  •  Philip Bortolotti
  •  Hardhik Sripuram
  •  Gerard Cardenas
  •  Pratyush Patra
  •  Diya Rajon
  •  Lakshay Gupta
  •  Andrew Yin
  •  Pablo Romero
  •  Frank Li
  •  Parthiv Shah
  •  Noah Hickman
  •  Harshit Dalmia
  •  Jason Heston

📝 General Updates

\uD83E\uDD45 Goals

  • Complete High-Level Timeline

  • Have a discussion about the new regs and what they mean for our team


💸 Operations

🛠️ Chief Engineer

  • We have four workdays left in this semester


\uD83D\uDDE3 System Updates

🚨 Controls:

Updates

  • Lucy - Lighting schematic in progress

  • Eliana - Worked on finding datasheet and connector info for the desired pedal sensor. Current selection might not be used. Completed brakeline portion of the schematic. Pushed her current progress

  • Maddie & Krish - Pushed schematic deadline to Nov 14th. Review required. Thanks Lakshay and Prat for leaving reviews!

  • Mika - Selected inputs sensors for dashboard. need to order

  • Akshay - Display is chosen, camera in progress. Blocked because current choice wasn’t waterproofed (mb)

  • Oscar - given controls leader-daughter which is comprised of dashboard

  • Second half of workday - tested motor noise on array (woop woop Ikococator)

Week Plan

  • Order display, cameras, lights, compute module

Upcoming Deadlines

  •   - Leader rework order

🔥 BPS:

Updates

  • Michael (the cooler one) got his first PR merged in!

  • Fan board, Scrutineering, and PSOM are all in

    • Most soldering and testing is going to have to happen outside of workday

  • Starting dev on some test boards

  • Admittedly, there is not as much work progress on boards as I’d like

  • Clark and Abby are making good progress on their boards

  • Pheonix was blocked for a bit by a Lakshay skill issue but is doing well in her project and is moving pretty fast

  • Michael is starting work on our watchdog

Week Plan

  • BPS members are getting a soldering showcase from Champers during workday

  • I will also be doing a talk on ✨ reading datasheets ✨

Upcoming Deadlines

  •   - Deadline

⚡ Power Generation:

Updates

  • Updates Go Here

Week Plan

  • Updates Go Here

Upcoming Deadlines

  •   - Deadline

📻 Data Acquisition:

Updates

  • Updates Go Here

Week Plan

  • Updates Go Here

Upcoming Deadlines

  •   - Deadline

🔋 Power Systems:

Updates

  • Power board schematic finished! good for review

  • Watts and Changxu almost done with an eFuse testboard schematic.

  • Shaun got polling test done for I2C BSP. Now working on interrupt based test.

  • Devin and Dylan finished contactor driver!!!!! Also finished high level block diagram of batt characterization board.

  • Jacob and Tony went through a bunch of edge cases with the Active Precharge board. Did a bunch of considerations into potential current pathways, floating nodes, etc.

  • Ravi still working on environmental board layout after several changes. Changes include creating a breakout board for humidity, temp, and airflow sensor. Currently trying to find a connector with a smaller form factor as per emech’s request.

  • Bosa and Kaden found a power monitoring chip for power monitoring board.

Week Plan

  • order contactor driver and (potentially) eFuse testboard

  • order mouser components

  • get power board reviewed and start layout

Upcoming Deadlines

  •   - Deadline

🔌 Electromechanical:

Updates

  • starting battery manufacturing

Week Plan

  • order hardware and aluminum

  • assemble universal enclosure and do water test workday

Upcoming Deadlines

  •   - Deadline

🧑‍🏭 Body:

Updates

  • Updates Go Here

Week Plan

  • Updates Go Here

Upcoming Deadlines

  •   - Deadline
  • Ergo jig materials ordered → manufacturing this week

  • Frame reference 1st iteration finished

Week Plan

Frame:

  • Finish composites research tasks by workday

  • Have ANSYS installed and ready to go

Ergo:

  • Manufacture ergo jig if possible

  • Start steering wheel research/design

  • Get Hall effect sensor and brake rotor/caliper specs (currently blocking Daybreak pedal box and brake calcs)

Upcoming Deadlines

  •   -Ergo Jig Manufactured
    •   - All potential drivers measured on Ergo Jig
  •   - Roll Cage Position/Bounding box set

🔩 Dynamics:

Updates

  • Updates Go Here

Week Plan

  • Updates Go Here

Upcoming Deadlines

  •   - Deadline

💨 Aeroshell:

Updates

  • Aero Dependencies Chart

  • We selected who is working on different projects

  • We have someone for shell to shell and canopy tilting

Week Plan

  • Jason and Aidan need to make reference sketches and two starter shells b4 next workday

Upcoming Deadlines

  •   - Deadline

✅ Action items

  •  

⤴ Decisions