\uD83D\uDC65 Attendance

  •  Michael Mohn
  •  Philip Bortolotti
  •  Hardhik Sripuram
  •  Gerard Cardenas
  •  Pratyush Patra
  •  Diya Rajon
  •  Lakshay Gupta
  •  Andrew Yin
  •  Pablo Romero
  •  Frank Li
  •  Parthiv Shah
  •  Noah Hickman
  •  Harshit Dalmia
  •  Jason Heston

📝 General Updates

  • PVDR is due from you guys Wednesday at Midnight

\uD83E\uDD45 Goals

  • Goals

 

 

 


💸 Operations

  • Electrify was successful

    • thank you to everyone who helped out

  • Austin Auto Festival this weekend so just more outreach this weekend

🛠️ Chief Engineer


\uD83D\uDDE3 System Updates

🚨 Controls:

Updates

  • Motor Controller isn’t working (CAN Issues)

  • Ongoing Pedals work

  • First draft lighting board schematic done

  • Good progress on rear camera

  • Leader layout has begun

Week Plan

  • meeting with Eliana tomorrow to finish schematic

  • Pickle tonight to fix MC

Upcoming Deadlines

  • first draft lighting schematic

  • reviewed pedals schematic

  • backup camera feasibility

  • documentation on MC parameters, purchase MC if issues cannot be resolved

🔥 BPS:

Updates

 

Week Plan

 

Upcoming Deadlines

⚡ Power Generation:

Updates

  • MPPT ADC breakout board review

  • Starting MPPT fw makefiles

  • Array layout w/ Jason

  • Temp and Irradiance sense board schematic start

  • constant current driver re make schematic

  • PV capture database implementation complete; continuing database manager

  • training loop for model works :DD

Week Plan

  • finish up array layout w/ jason & send it to d2

Upcoming Deadlines

📻 Data Acquisition:

Updates

  • Array and battery sim are hard

  • Leaderboard progress continues

Week Plan

  •  We try our hand at the challenges placed before us

Upcoming Deadlines

- RF Receiver Schematic

- IMU/RPM board proposal

🔋 Power Systems:

Updates

 

 

Week Plan

 
  • Power board layout 95% complete. Will get done very soon.

  • Board orders will go out very soon (eFuse test board, contactor driver, dataacq env board, active precharge (maybe))

Week Plan

  • Battery manufacturing (spotwelding) will begin next workday

  • Continue board development

 

Upcoming Deadlines

  •  

🔌 Electromechanical:

Updates

  • critical hardware back in car and harnessed

  • mock cooling intake done to send to regs

  • ready to manufacture mock modules

  • start characterization of a few cells with ps

Week Plan

  • have all battery box panel cutouts finished and dxfs created for waterjet

    • only layups will be a blocker then

 

 

Upcoming Deadlines

  •  EOD Sat - BB waterjet files

🧑‍🏭 Body:

Updates

  • Frame

    • first frame iteration finished → simming to begin

    • initial composite research finished → sandwich panel design and mount design next

  • Ergo

    • drivers sized → driver model can be finalized this week

 

 

 

Week Plan

Frame

 

 

Ergo

  • start simulating frame → get initial data for first iteration

  • create initial design ideas for frame jig

Ergo

  • continue working on steering wheel designs

  • finish up daybreak pedal box changes (test pedal jig, finish design)

  • start work on next gen seat

 

Upcoming Deadlines

  •  Nov 16, 2024 - Roll cage position/dimensions set
  •  Nov 16, 2024 - Driver Model finalized
  •  

🔩 Dynamics:

Updates

  • Unsprung: Unsprung ran sims on axle diameters, tried out SKF Sim Quick Pro for bearing and trailing arm geometry began development

  • Suspension: Suspension researched adams kinematics software, Kayla worked on refining her sketch to find non-hdpts defined values, trailing arm geometry began development

  • Steering: Steering worked on bump steer research + created a 3D sketch for Ackermann because I had anti for some reason + found the C factor of the old steering rack on the car + found issues with steering placement relative to the bounding box that we have + found a steering geometry that should work for new gen

 

Week Plan

  • Unsprung: 2 upright designs, 2 hub designs for Sami, Sumi, and Sohan. Jonathan works on rear swingarm which shows methods of motor and caliper mounting

  • Steering: Research bump steer optimization and have it implemented in CAD by workday

  • Suspension: Carter secures adams/dynatune, La’akea sims pushrods, Oliver sims control arms, Manas works with Jonathan on refining trailing arm hdpts

 

Upcoming Deadlines

  •  
  •   - Location of steering rack (code is broken, talking to Jacob about it. Will try to get a value that is worst case though.) - Steering
  •   - Length of tie rods (code is broken, talking to Jacob about it. Will try to get a value that is worst case though.) - Steering
  •   - Steering rack extender length (code is broken, talking to Jacob about it. Will try to get a value that is worst case though.) - Steering
  •   - Backup tires that aren’t Bridgestone are decided - Unsprung
  •   - Brake calipers and rotor size decided (Arav needs to get us this data) - Unsprung
  •   - Model bending forces and moments on the axle (working on throughout the week) – switched to doing sims instead - Unsprung
  •   - Axle diameter decided (doing the calcs for it throughout the week) - Unsprung
  •   - Axle length (already have somewhat of an idea) – switched to doing sims instead - Unsprung
  •   - Upper steering architecture selected (is in talks with ergo and suspension)- Steering
  •   - Bump steer design optimization - Steering
  •   - Finalize brakes and rotor config (Arav needs to get us this data) - Unsprung
  •   - Caliper and motor mount for Swingarm - Unsprung + Suspension
  •   - Decide bearings - Unspung
  •   - Suspension non hardpoint critical values decided - Suspension
  •   - Version 1 of Upright design in CAD - Unsprung
  •   - Version 1 of Hub design in CAD - Unsprung
  •   - Suspension Geometry Finalized - Suspension

💨 Aeroshell:

Updates

  • Aerodynamics

    • Members have been taught ANSYS

  • Composites

    • Battery box layup, worked on resin infusion research and test fixtures for composite panels

 

Week Plan

  • Aerodynamics

    • Everyone have a sim done of the parts that they have made by next workday

    • Getting into the flow of make variation, sim variation

  • Composites

    • Battery box, first frame panel test subject, maybe machining test fixtures (not sure on this yet, depends on materials), design molds for wire cutter

 

Upcoming Deadlines

  •  Nov 16. 2024 - all members have run sim

✅ Action items

  •  rray Array and Aeroshell meet on workday to discuss array layout after D2 meeting
  •  Electric figure out if driveday can be done during Thanksgiving
  •  

⤴ Decisions