Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

wip THIS PAGE IS IN DRAFT FORM 

All student film productions must upload a signed Production Approval Form at least two business days prior to equipment checkout.  
***Productions without signed and uploaded approval forms will not be cleared to pick up equipment***  

Step 1. Fill out a [Production Approval Form]. 

Step 2. Send your shooting script and completed Production Approval Form to your faculty advisor/instructor to schedule a Pre-Production Meeting.  

Step 3. Take a printed copy of the completed Production Approval Form to your Pre-Production Meeting and discuss your production plan. 

Step 4. Both you and your instructor should sign the Production Approval Format the end of your Pre-Production Meeting. If your instructor answers NO to question 20, skip to Step 6. If your instructor answers YES, continue to Step 5. 

Step 5. Schedule a meeting with Keefe Boerner and get his signature on page 2 of the Production Approval Form. 

Step 6. Scan the signed form and save it with the filename: yyyymmdd_PAF_LastnameFirstname (Note: yyyy_mm_dd = equipment pick up date).

Step 7. Upload the completed and signed Production Approval Form to the appropriate folder hyperlinked below:

RTF 340 Music Video
RTF 343 Adv narrative
RTF 366K Narrative Production
RTF 366K Social Media Production
RTF 366K Documentary Production
RTF 366k Latinx Filmmaking
RTF 369 Script to Screen: Movies
RTF 881KA Grad Doc

RTF 881KB Grad Narrative 
RTF 488M Grad Pre-Thesis 
RTF 488M Grad Thesis

***Production Approval Process must be completed at least two business days before your equipment check out***