Purpose: develop a rough idea of a timeline for your system, including major goals, their dependencies, and when you want to accomplish them by
Aeroshell
Major Goals | Dependencies | Rough Timeline |
---|---|---|
Design shell | Fergo, what does the frame look like Dynamics, how much space will wheels take/ turning radius etc, exposed suspension Array - array size/config |
|
Demold bottom shell |
| |
Top shell layup complete |
| |
Bottom shell layup complete |
|
Fergo/Structures
Major Goals | Dependencies | Rough Timeline |
---|---|---|
Frame welded | Frame validated and ordered |
|
Pedal box assembled | Drivers set in stone, driver model created, pedal design validated and ordered | |
Chassis width decided | Dynamics geometry decided |
Dynamics
Major Goals | Dependencies | Rough Timeline |
---|---|---|
Onboarding/Training | Recruitment |
|
Trackwidth decided |
| |
Volumetric bounding box decided |
| |
|
| |
Unsprung components assembled |
| |
Suspension components assembled |
|
Electromechanical
Major Goals | Dependencies | Rough Timeline |
---|---|---|
Volumetric bounding box decided (New Car) | Frame/Dynamics - where battery can go, how much space there is |
|
New Battery finished/manufacture (New Car) | Electrical Frame | |
New Cooling Finished (New Car) | Frame, Aeroshell, Battery - duct routing, exhaust/inlet placement Possibly: Ergo, Dynamics, and Enclosures placements (in case of any interferences) | |
High level placement of enclosures/electrical hardware (New Car) | Electrical Aeroshell - lights | |
Battery Pack Module/Segment interfacing hardware/parts (Day Break) | Power Systems - new/old cells BPS - how modules will be organized into segments | |
Battery Box manufactured (Day Break) |
| |
Driver cooling + motor controller design complete | Controls Frame Dynamics Aeroshell |