\uD83D\uDC65 Participants
\uD83E\uDD45 Goals
Individual System Requirements
Research/testing Checkpoint Review
Onboarding StrategyDesign Brainstorm and Development?
Daybreak Plan
Trial Workday Plans
\uD83D\uDDE3 Discussion topics
Item | Notes |
---|
Preliminary Design Strategy
come up with goals
start brainstorming different options for system architecture (prototyping) - this doesn’t have to be dependent upon optimal characteristics
continue conducting research and testing
use findings to inform which options are good and which won’t work
choose optimal option and revise design to match optimal characteristics
Example:
✅ Action items
Division/System Requirements | High Level Flowchart: 2024-2026 Requirements Sheet |
Research/testing Update | 3 wheel or 4 wheel
|
Design Architecture Options | For a 3 wheel car: Driver and battery position
Aeroshell - find optimal shell profiles (front and side) for the above options
Dynamics
|
Design Philosophy |
|
Daybreak Plan:
won’t have a dedicated discussion, just a check in on progress
System | |
---|---|
Aeroshell | What is broken/insufficient?: What repair options exist?: How much time do you believe each option will take?: What level of involvement could new members have in these processes?: What is your overall outlook on the feasibility of us repairing daybreak with such a capacity that we could pass scrutineering in FSGP 2025?: |
Fergo | What is broken/insufficient?:
What repair options exist?:
How much time do you believe each option will take?: What level of involvement could new members have in these processes?: What is your overall outlook on the feasibility of us repairing daybreak with such a capacity that we could pass scrutineering in FSGP 2025?: |
Dynamics | What is broken/insufficient?:
What repair options exist?:
How much time do you believe each option will take?: What level of involvement could new members have in these processes?: What is your overall outlook on the feasibility of us repairing daybreak with such a capacity that we could pass scrutineering in FSGP 2025?: |
Emech | What is broken/insufficient?: What repair options exist?: How much time do you believe each option will take?: What level of involvement could new members have in these processes?: What is your overall outlook on the feasibility of us repairing daybreak with such a capacity that we could pass scrutineering in FSGP 2025?: |
Trial Workday Plan:
What if someone wants to do two systems at once?
What materials do we need for your plans?
Logistics: how to go from one system to another, do you need the car for your plans, etc.?
System | Plans |
---|---|
Aeroshell | Make a bomb |
Fergo | |
Dynamics | Meth |
Emech |
✅ Action items
- Jason Heston Aidan Hodgin Continue practicing surface modeling in Solidworks
- Noah Hickman Joshua Miksits Start modeling a basic frame (make it adjustable by using reference sketches, global variables, and equations); look at roll cage designs
- Harshit Dalmia Start making a skeleton reference sketch for dynamics (make it adjustable by using reference sketches, global variables, and equations)
- Parthiv Shah Continue working on new pack/box design - refine design; come up with replacement enclosure for Daybreak