...
Dynamics: | Aeroshell: | Body: | Emech: | |
---|---|---|---|---|
Dependency Tree & Timeline | Please link you dependency trees and timelines (as discussed during last leads meeting) below: | |||
Blockers | What is blocking you from starting designing (CAD - even if just preliminary/prototyping)? Do you have any other blockers? | |||
|
|
|
| |
Workday Review |
| Aerodynamics:
Composites
| Frame:
Ergo:
|
|
Next Workday Plan - please break tasks down into sub-tasks |
| Aerodynamics:
Composites
|
|
|
Daybreak Progress? |
|
|
|
|
Questions people want to ask: | ||||
What do you need from me this week? |
✅ Action items
- Have some sort of internal dependency tree for leads tomorrow - Everyone
- Make a defined dynamics reference sketch (doesn’t have to have exact values, just has to be defined) by EOD Tuesday - Harshit Dalmia Kayla Lee
- Have an overall frame bounding box for aeroshell (includes roll cage position, frame max height, frame length, and width in front and rear) by EOD Tuesday - Joshua Miksits
- Get an idea for battery bounding box and driver model to finish a preliminary reference sketch
- Have a discussion about reference sketches with Jason
- Rough draft for PVDR by Monday - Everyone
⤴ Decisions
Review standardized global coordinate system
+z → longitudinal forward
+x → lateral left
+y → transverse upward
Pay attention to align part with this coordinate system (SolidWorks default coordinate system)
It is fine for smaller parts to be defined not aligned with the referfence sketch origin
Subassemblies need to be defined relative to a reference sketch (i.e., control arm subassemblies, etc.)
Reference Sketch Discussion
A part, not an assembly
Key features that define geometric properties and location of systems
Everything derived from HDPT sketch
Review naming convention in Confluence
Have a dependency tree with a set of items that are agreed upon by both the subleads and systenm leads
Blockers
Aeroshell
Frame and Dynamics reference sketches need to be done asap with all critical architecture, begin working on spaceclaim for bounding boxes
Dynamics needs suspension geometry, suspension reference sketch
Frame needs to have a 3D reference sketch done by EOD tomorrow
We need to begin part level design
Notes: