Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The UT Austin School of Architecture Build Lab is located on the first floor of Goldsmith Hall and houses the UT Austin School of Architecture's Wood, Metal, and Casting Shops. Build Lab hours are posted posted here.

This is your source of information about our hours of operation, training available to you, our policies, equipment, and tools.

...

Housed in the 6,600 square interior space are areas for casting concrete and plaster, a metal working shop, an extensive wood shop, a 45’x35’ 25-station classroom work area, and a finish room. Among the equipment it contains is a Shopbot CNC Router with a 96” by 60" bed, two Sawstop table saws, a 10hp Oliver table saw, a 20" bandsaw, a 16" joiner, a 24" planer, a 25-ton iron worker, Millermatic 252 welder an 85-watt Hypertherm plasma cutter, and a mill. The 1,800 square foot covered exterior deck features large open spaces with 220v and 110v electrical service and water. The exterior and interior spaces are connected by two hydraulic elevators.

Child pages (Children Display)
styleh2

Contact Information

Excerpt

Casey Stringham, Facilities  Facilities Manager

casey.stringham@austin.utexas.edu | GOL 1st Floor