\uD83D\uDDD3 Date
\uD83D\uDC65 Participants
\uD83E\uDD45 Goals
To discuss how we are going to approach this year and give/receive feedback on initial plans
Discussion topics include
recruiting plans
onboarding strategy and curriculum
system timelines
Announcements
Welcome back!
Final recruiting timeline has been posted. Refer to Slack for details
\uD83D\uDDE3 Discussion topics
Housekeeping
Has every system decided on their sub-system leads?
What are our thoughts on implementing a skeleton model this cycle?
Recruiting (Time: 10 mins)
Purpose: develop some plan for recruiting, including roughly how many people you want to recruit and for what purpose
System | Category | Number to Recruit |
---|---|---|
Aeroshell | Total | |
Design | ||
Manufacturing/Composites | ||
Fergo/Structures | Total | 3 |
Frame | 2 | |
Ergo | 1 | |
Dynamics | Total | 12 |
Steering | 4 | |
Suspension | 4 | |
Unsprung Mass | 4 | |
Emech | Total | |
Enclosures | ||
Cooling | ||
Wire Harnessing |
Onboarding (Time: 30 mins)
Purpose: discuss ideas for an onboarding strategy and curriculum (i.e. starter projects, lessons, etc.)
Notes | ||
---|---|---|
General Ideas/Thoughts |
| |
Aeroshell | Strategy: Curriculum: | |
Fergo/Structures | Strategy: Trial by fire (with help as needed) Dive straight into making a simple part following ASC and VR3 guidelines, experimenting and asking questions as you go along Curriculum:
| |
Dynamics | Strategy: 2 weeks of independent study throughout the week and discussions and applications on workdays. Curriculum:
| |
Electromechanical | Strategy: Curriculum: |
Timeline (Time: 50 mins)
Purpose: develop a rough idea of a timeline for your system, including major goals, their dependencies, and when you want to accomplish them by
Aeroshell
Major Goals | Dependencies | Rough Timeline |
---|---|---|
Demold top shell |
| |
Demold bottom shell | ||
Top shell layup complete | ||
Bottom shell layup complete |
Fergo/Structures
Major Goals | Dependencies | Rough Timeline |
---|---|---|
Frame welded | Frame validated and ordered |
|
Pedal box assembled | Drivers set in stone, driver model created, pedal design validated and ordered | |
Chassis width decided | Dynamics geometry decided |
Dynamics
Major Goals | Dependencies | Rough Timeline |
---|---|---|
Onboarding/Training | Recruitment |
|
Trackwidth decided | ||
Volumetric bounding box decided | ||
Unsprung components assembled | ||
Suspension components assembled |
Electromechanical
Major Goals | Dependencies | Rough Timeline |
---|---|---|
Volumetric bounding box decided |
| |
Battery pack design decided (to start battery box design) | ||
Overall wire harnessing diagram complete | ||
Driver cooling design complete | ||
Motor controller cooling design |