Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »

\uD83D\uDDD3 Date

\uD83D\uDC65 Participants

\uD83E\uDD45 Goals

  • Dependency tree & timeline review

  • Weekly progress/blockers check

\uD83D\uDDE3 Discussion topics

Item

Notes

Announcements

Highlights

Does anybody have any highlights from the week they would like to share?

Dynamics:

Aeroshell:

Body:

Emech:

Dependency Tree & Timeline

Please link you dependency trees and timelines (as discussed during last leads meeting) below:

image-20241028-180810.png

Blockers

What is blocking you from starting designing (CAD - even if just preliminary/prototyping)? Do you have any other blockers?

  • Geometry but that is accounted for in the timeline

  • Finalized driver model/roll cage bounding box → ergo jig manufacturing and collected data

  • Frame reference sketch → rear hardpoint reference sketch (front is done alr)

  • Brake calcs finishing→ caliper and rotor selection from Dynamics

  • Maximum sizes although we are designing everything to be flexible - once we have max/target sizes we can modify

Workday Review

  • Timeline made

  • Unsprung worked on our mockup cads, caliper/brake calculations, trailing arm design and collaboration with suspension

  • Steering talked to Jacob about RMS error, code, and geometry optimization

Frame:

  • Mini solids/frame design lecture

  • Frame concepts (front and rear) designs continued, close to having preliminary design

  • Frame reference sketch created → will have 1st iteration this week

  • Composites Research continued → first round of research due this workday

Ergo:

  • Pedal box redesign continued (getting closer, pedal ratio redesign finished)

  • Brake calcs continued (again, blocked currently)

  • Seat outline created for more accurate driver model

  • Ergo jig design done → manufacturing this week

  • Battery review done, ready to start manufacturing

  • Adjustable angle vibe table jig skeleton done

  • Intake and exhaust started for battery box

Next Workday Plan

  • New members join us on newgen geometry design

  • Unsprung begins working on CAD for newgen rather than old gen

  • Frame ref sketch 1st iteration finished → move to adding weldments

  • Ergo jig built → data measurements begin

  • Pedal jig printed?

  • ?

  • Manufacturing plans, who’s doing what, hardware, stock, and part inventory

Daybreak Progress?

  • From what dynamics understands, y’all are going to do it

  • Frame welding soon?

  • Battery review done, ready to start manufacturing

Questions people want to ask:

What do you need from me this week?

✅ Action items

  •  

⤴ Decisions

  • No labels