\uD83D\uDC65 Attendance

  • Michael Mohn
  • Philip Bortolotti
  • Hardhik Sripuram
  • Gerard Cardenas
  • Pratyush Patra
  • Diya Rajon
  • Lakshay Gupta
  • Andrew Yin
  • Pablo Romero
  • Frank Li
  • Parthiv Shah
  • Noah Hickman
  • Harshit Dalmia
  • Jason Heston

📝 General Updates

💸 Operations

Updates

CR

  • Annika

    • working on getting the oscilloscopes (need purchase update from y’all)

    • tentative ship date for the transducers is 12/12

  • Niloo

    • Working on cowtown materials for massive foam blocks

    • still on the hunt for solar cells and stuff (need some responses from Andrew)

    • Working on smaller foam machiners

  • Arav

    • brakes and stuff, not much from him yet

  • Jackson

    • Mainly monetary right now

PR

  • Big things to come with ePlan

    • bi-weekly videos with their production team for mini-series

    • USA President and Global President slated to attend unveiling

      • hopeful unveiling partners

    • We need to begin using the software so that we can get into using the stuff for videos

      • these videos will be on ePlan website and socials and we can use as well

      • PR team will begin working on this starting our workday

Workday Plan

  • Begin teaching the team about new outreach software Jackson found

  • Practice pitches and cold calls

  • Final call for systems to give requests before break

  • Work with teams to finalize plans for merch and new opportunities to come next sem

🛠️ Chief Engineer

✅ Previous Action items

  • Andrew gonna motivate (smile)
  • i wanna talk with aeroshell
  • i wanna talk with gerard/diya/parthy
  • power gen new lead
  • Rectangular vs Curved top shell FEA done by workday

\uD83D\uDDE3 System Updates

🚨 Controls:

Updates

  • Motor Controller STILL isn’t working (no more CAN Issues tho)

    • Parthiv can say more abt this

    • Don’t think this is from Controls side, need to verify.

  • Three more members know how to use profinity/set up + debug

  • Maddie and Krish - Layout in progress

  • Lucy - Lighting schematic draft reviewed

  • Oscar - Leader Dash, SendTriitum

  • Mika - Addressing Parthiv’s ideas on dashboard, addressing pedals board accel sensor

Week Plan

  • meeting with Eliana Thursday to look at brakeline for board

  • I intend to stay on campus throughout break to catch up on whatever work is behind (after 5 PM everyday): pedals board, MC fix if possible, ordering, finalizing with dash etc.

Upcoming Deadlines

Pedal needs to have first draft completed EOW.

🔥 BPS:

Updates

  •  Boards are developing

  • Michael tested his watchdog on hardware but there’s some weird stuff going on, will be starting RTOS stuff soon

  • Phoenix is testing her RTOS stuff on a Nucleo now

  • Aneri got SPI running on Nucleo and is working on it over break

  • Clark is pretty close to starting layout and I think he can get it done pretty quickly

  • Abby is also pretty close to starting but she needs to address comments on the schematic

  • Progress on Amperes board is kinda slow, if it conitnues to be slow I’ll starting adding more help

Week Plan

 

Upcoming Deadlines:

  • 11/09/26 - BPS Software Architecture

  •  

 

⚡ Power Generation:

Updates

  • Accepted quote for MPPT

  • Tanya and Tong about to send review request

    • Constant current lighting driver schematics

    • Temperature sensor schematics

  • Erika started ADC breakout boards layout

Week Plan

  •  

 

Upcoming Deadlines

  • 12/16/2024 - Order boards

  • 01/19/2024 - Array x Mechanical PDR

 

📻 Data Acquisition:

Updates

  • Weather + Array + Battery + Terrain all integrated. Working on simulating dynamics.

  • RF Receiver schematic complete. Working on layout

  • IMU/RPM board schematic complete. Working on layout.

Week Plan

  • Give thanks to the people that have given us so much

Upcoming Deadlines

- RF Board Layout

- IMU/RPM Board Layout

 

🔋 Power Systems:

Updates

  • Power board layout complete. Waiting on review. Reviews will be addresed prior to thanksgiving break and ordered by the same deadline.

  • Contactor driver and dataacq env board ordered.

  • eFuse testboard ready for review. Will be ordered alongside power board

  • Good progress on env board software (reading humidity and temp values on terminal).

  • Active precharge board undergoing a slight change (changing power delivery from LDO to buck). Finished and awaiting review.

  • Power monitoring board sch reviewed. Layout will start soon.

  • Encountered some issues when trying to spotweld on sigmaclad. Reached out to Kevin Yu (electric) with observations and questions. Havent recieved a response just yet.

Week Plan

  • Continue battery manufacturing (spotwelding) testing

  • review active precharge and eFuse testboard.

  • We also try out hand at the challenges placed before us. But we do it better. 😎

 

Upcoming Deadlines

  • - Power Board Layout
  • - Order Power Board
  • - Order eFuse testboard
  • - ESP32 Batt Char board sch
  • - Power Mon board layout
  • - Active Precharge layout

🔌 Electromechanical:

Updates

  • eplan licenses acquired

  • moco cooling complete

  • Intake/exhaust panel patterns

Week Plan

  • replace motor fuse, try to run again

  • finish battery panels and send them to get water jet

  • start manufacturing new battery locks

  • start manufacturing vibration jig

  • cooling stuff - intake, exhaust, mppt, calcs

 

Upcoming Deadlines

  • Dec 4 - MPPT and MoCo Enclosures

 

🧑‍🏭 Body:

Updates

  • Frame 1st iteration had to be redone

  • Jig Design plan and Welding order started

  • Pedal Jig used, pedal ratio was tested and confirmed for daybreak pedal box redesign

  • Steering Wheel layup setup tested, CFC viable for steering wheel construction, needs some refinement

Week Plan

  • Go over welding theory to help with jigging/welding plan

  • Re-finish 1st frame iteration, start ansys sims

  • Decide pedal box placement/bounding box

  • Continue work on Daybreak pedal box redesign

 

Upcoming Deadlines

  • Nov 16, 2024 - Roll cage position/dimensions set
  • Nov 16, 2024 - Driver Model finalized
  •  

🔩 Dynamics:

Updates

  • General:

    • Manufactured inserts for composite testing

  • Unsprung:

    • Decided brakes

    • CAD for rear a-arm structure

    • Sohan began learning manufacturing with me and Gerard

  • Suspension:

    • Talked with fergo to better understand bounding boxes and HDPTS need to be changed

    • All members got Ansys installed

    • Carter is doing finding the loads related to bell cranks

    • Oliver and La’akea began learning manufacturing with me and Gerard

  • Steering:

    • Found lower steering rack geometry

 

Week Plan

  • Unsprung:

    • More mockup designs for both front and rear

    • Break button dimensions and forces on the rotor when we lock up

  • Suspension:

    • First iteration rear reference sketch

    • Load conditions for suspension focusing on bell cranks

    • Oliver and La’akea testing pushrods

    • Test with dummy suspension

  • Steering:

    • Reviewing lower steering rack geometry

    • Members work on designs for upper steering, figuring out how gearbox will work

 

Upcoming Deadlines

  • - Brake calipers and rotor size decided (Arav got us this data) - Unsprung
  • - Upper steering architecture selected (is in talks with ergo and suspension)- Steering
  • - Bump steer design optimization - Steering
  • - Version 1 of Upright design in CAD - Unsprung
  • - Finalize brakes and rotor config (Arav got us this data) - Unsprung
  • - Caliper and motor mount for Swingarm - Unsprung + Suspension
  • - Decide bearings - Unspung
  • - Version 1 of Hub design in CAD - Unsprung
  • - Suspension Geometry Finalized - Suspension

💨 Aeroshell:

Updates

  • Aerodynamics

    • some members(at least 2) got their sims done

  • Composites

    • all bb layups except 1

    • all daybreak prep done, pretty much ready to bond w/ frame whenever

    • Did first frame test pieces

    • Did one with a higher vol fraction which looks better (bc less excess resin) but i forgot to take pic

    • Sanded the fcf part a bit, not effective. takeaway: we need to get rid of layer lines in mold. solution, more sanding or acetone vapor stuff

      image-20241203-012523.png
    • michael and i cleaned out pickle

 

 

Week Plan

  • Aerodynamics

    • everyone needs to have an idea for the part they want to put on the shell, it needs to be able to put together as a final part on workday

  • Aeroshell(me)

    • need to define some architecture things by workday, flat topshell or not,

  • Composites

    • finish battery box, another metal sheet to be sanded, start making test coupons for nomex honeycomb frame panels, finalize test fixtures for panels, finalize test plans for demold and resin infusion

    • Also will be working w/ emech to finalize plans for composite enclosure and also testing abs acetone vapor stuff to use in composite enclosure and composite steering wheel

 

Upcoming Deadlines

  • Nov 20, 2024 - aerodynamics members have sims prepped
  • - Battery box layups + Kaden's test panel complete
  • - Daybreak shell prep complete and ready for shell to frame attachment
  • Dec 7, 2024 (Before workday) - Aerodynamics members know what part they want to put on the shell
  • Dec 7, 2024 (EOD) - Model of car is made around the frame, and it has all the parts that members have made

✅ New Action items

  •  

⤴ Decisions