MUST USE GRAD SUITE "G" |
|
Patch into tieline #1 to the CMB Rack Room |
|
Go to the CMB Rack Room – (you will need a key) TechStaff has to open this room for you. |
|
Patch into the SPARE DA 2 IN |
|
With another patch cable patch out of SPARE DA2 into the studio you want to use |
|
In this case we are going to patch into Studio C or LAB C |
|
If you want to verify signal from the suite first before looking into the studio you can look at the TVLogic Monitor "B" input by patching into it shown here. |
|
Now go to the studio. You must get techstaff to open the A/V racks in the studio. |
|
Patch HD-SDI VIDEO |
|
If you are having trouble you might need to reboot the Bright Eye Mito > power cycle it. |
|
Manage space
Manage content
Integrations