Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

-Edits to box: smaller clearances, adjusted locations of grounds as they weren't matching up with the kinematic analysis (had a few problems with the laser cutter software at the beginning)

-Added sides to the box, this drastically improved the quality of movement as the joints no longer had any ability to move in the z-direction which was causing the links to twist and jamming the mechanism.

-Random edits: filing down the one bolt to be the correct length



VIDEO HERE OF FINAL MOTION

  • No labels