2024-10-21 TPEE (Commercial MPPT) Meeting

Questions

  • R we able to flash our own algorithms

    • yes

  • What kind of telemetry data

    • temperature

    • current, voltage

    • operating model

    • limits

    • curve tracing (IV curve)

  • How did you follow the design process?

  • Issues/challenges with the MPPT as he designed

    • Don't rush building these MPPT

    • Testing

    • Controls

    • Doing it digitally makes it prone to bugs

    • Redline → Shut off all switches

    • Current limits (control loop)

      • cascaded control loop

      • current set point in the control loop

      • done in software

    • Voltage limits

    • Keep in mind to be careful while routine to decrease capacitance → decreases

  • Filter to measure frequency(?)

    • Transient frequency is at that frequency

    • control loop run faster than the resonant frequency of the LC

    • digital control loop should be fast

  • Business

    • Lead time: 1-2 weeks

    • Request quotes on the website

 

Notes

  • Efficiency

    • modeling the losses of the components

    • GaN Fets

    • optimization algorithms

  • Open-source hardware

  • There’s a tool that can help us view telemetry data and our own firmware

  • microprocessor used: STM G4 series, high-resolution timer

  • Switching frequency

    • constant

    • 40 kHz