7. Conclusions

In order to confirm that my prototype matched the analysis I removed the third link and put a pen through the pin hole at the end of the second link to record its path. Based on visual inspection the prototype matches the PMKS and MATLAB analysis results perfectly, laterally confirming all of the other results of the simulation.