Item | Notes |
---|
Announcements | Trial workday is this Saturday from 1-5ish. We will still start workday at 9:30am. We will all meet at ETC and leave for Pickle in the morning. Drivers will return to ETC by 1 to pick up recruits. Reminder that we will be discussing setting a track width, wheelbase, and CoG location in the morning (and work on architecture brainstorming) If you have a car please bring it if you can to reduce the amount of back and forth Wear your solar shirt if you can
Reminder to have material ready to set a track width, wheelbase, and CoG location by Saturday; architecture brainstorm ideas by Sunday Daybreak disassembly date still undetermined (either Saturday or Sunday). What is the purpose of disassembling the car this early? Can we meet this week to have a case study of Electric’s assembly management, and how they use dynamics and frame reference sketches
|
Review Last Workday | Aeroshell Body: Dynamics Electromechanical SW24 installed Finalized nextgen SOM layout Redoing electrical topological map - started migrating from Draw.IO to kicad Battery Module design almost finalized, module PCBs being designed Battery box enclosure skeleton model done, extrude once internal dimensions finalized
|
Design Standards | Design Organization Standards |
Trial Workday Plans | https://cloud.wikis.utexas.edu/wiki/x/4wEdCw |
Aeroshell Mold Manufacturing Plan
| Used Daybreak dimensions to determine mold dimension Split mold Pros Cons Would potentially have to cut down foam stock — we are given standard sizes We bought the foam that the foam people got from the supplier—even larger size We might need extra prep to cut foam Buy more stock than you need and roughly cut it? We got our foam and it was a special order because we didn’t need it cut, sawyer didn’t do any work to prep it Sawyer only picked up the foam from the pallet and then machined it
This is a mold prep solution Attaching the molds together isn’t that difficult, mold is pretty stable Composites is really rough and hands on, we can use dowels and straps to line things up, no force is pulling them apart Timeline in which we receive molds must be considered. You will not get molds at the same time. Do we wait and get a quote for both?
Top shell double or part of bottom shell like c[] (3 parts) or c] (two parts and wider base)
|