Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

\uD83D\uDDD3 Date

\uD83D\uDC65 Participants

\uD83E\uDD45 Goals

  • Trial Workday

  • Design Standards

  • Workday Review

  • Aeroshell Mold Manufacturing Plan

\uD83D\uDDE3 Discussion topics

Item

Notes

Announcements

  • Trial workday is this Saturday from 1-5ish.

    • We will still start workday at 9:30am. We will all meet at ETC and leave for Pickle in the morning. Drivers will return to ETC by 1 to pick up recruits.

    • Reminder that we will be discussing setting a track width, wheelbase, and CoG location in the morning (and work on architecture brainstorming)

    • If you have a car please bring it if you can to reduce the amount of back and forth

    • Wear your solar shirt if you can

  • Reminder to have material ready to set a track width, wheelbase, and CoG location by Saturday; architecture brainstorm ideas by Sunday

  • Daybreak disassembly date still undetermined (either Saturday or Sunday). What is the purpose of disassembling the car this early?

    • Decision: Postpone disassembly

  • Can we meet this week to have a case study of Electric’s assembly management, and how they use dynamics and frame reference sketches

    • Decision: Replace time saved from postponing disassembly with this meeting

Review Last Workday

Aeroshell

Body:

  • Determined trial workday invitees

  • Frame:

    • Started downloading 2024 Ansys (to start messing with composite simulation)

    • Practiced SolidWorks with Model Mania (2 parts and 1 sim)

    • Installed and configured VR3 weldments

    • Began collecting goals for composites testing

  • Ergo:

    • Worked on design changes for last year’s pedal box

    • Researched issue with pedal box (master cylinder)

    • Finished occupancy space requested by cesar (Needs quick revision)

    • Talked with controls about plan for steering wheel and dashboard

Dynamics

Electromechanical

  • SW24 installed

  • Finalized nextgen SOM layout

  • Redoing electrical topological map - started migrating from Draw.IO to kicad

  • Battery Module design almost finalized, module PCBs being designed

  • Battery box enclosure skeleton model done, extrude once internal dimensions finalized

Design Standards

Design Organization Standards

Trial Workday Plans

https://cloud.wikis.utexas.edu/wiki/x/4wEdCw

Aeroshell Mold Manufacturing Plan


✅ Action items

  • Dynamics and Frame, investigate Electric’s reference sketch

⤴ Decisions

  • No labels