New Power path controller IC (LTC4421). Will hopefully remove the consideration of switching latency that we had previously.
Ensure that MOSFET part selection can handle our specifications.
LV Enable signal will now be part of BB Power Distribution Unit. In other words, we will need only 1 output compared to the 2 outputs we had previously.
Tentative Timeline:
9/14 - 9/21: Complete research for LTC4421
By 9/21: Complete preliminary schematic
9/28: Begin design review, check for correct connections and that all necessary features have been enabled
9/28- 10/5: Start working on layout, continue design reviews
11/2: Finish layout (tentatively prep for ordering the board and finalizing BOM)
By 12/7: Start on testing and debugging board once ordered and soldered