2024-08-31 Electrical Leads Timeline Meeting

Main points-

  • Do we have big reviews for all of electrical or do we organize specific project reviews?(ex: power arch, battery, som, sharepoint) Who is working on what? Any other big project reviews?

    • Battery-

      • Emech, Power Systems, and BPS

      • Present daybreak design and additions for solar McQueen

        • Present module design, integrate with the battery box, what needs to be manufactured

      • October 5th

    • Power Architecture/SOM-

      • Include enclosures and where boards go in the car

      • How do we integrate boards with enclosures

      • SOM review

      • September 28st, After workday

    • Sharepoint-

      • Next week

      • v0

        • Nathaniel’s PR

        • Compiling with the right structure

      • v1

        • BSP works with hardware, completely blackboxed

        • Spring Break

        • System level deadlines(ex: UART) set internally

    • Sensor Suite-

      • How are we meeting mechanicals reqs for sensors?

      • Blindspot detection

      • October 12st

    • System Architecture Document

      • September 28th

  • What are our goals for daybreak and what are our checkpoints?

    • Drive days by Spring Break

    • Battery Done beginning of Feb

    • Power Board Mid-Jan

    • BPS stuff Mid-Jan

    • Motor- Just be working

      • DashboardBoard- Beginning of December

      • Leaderboard Board- Whenever it gets done

    • Buy MPPTs ASAP

    • Contactor Driver x Fan BoardBoard- Beginning of December

      • Drive fans with the same signal and power out

      • Make all connectors vertical(verify connector with Farthiv)

  • System Diagrams and requirements

    • System Diagrams done by 28th ideally much much much much earlier

    • Requirements done by 28th

  • Onboarding

    • Big overview, Split into systems and review system level things, Electrical overview, WOrkday 2 now, presentation, projects

  • Design Standards

    • Later