Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

\uD83D\uDDD3 Date

\uD83D\uDC65 Participants

\uD83E\uDD45 Goals

  • Individual System Requirements

  • Research/testing Checkpoint Review

  • Design Brainstorm and Development

  • Daybreak Plan

  • Trial Workday Plans

\uD83D\uDDE3 Discussion topics

Item

Notes

Preliminary Design Strategy

  1. come up with goals

  2. start brainstorming different options for system architecture (prototyping) - this doesn’t have to be dependent upon optimal characteristics

  3. continue conducting research and testing

  4. use findings to inform which options are good and which won’t work

  5. choose optimal option and revise design to match optimal characteristics

There is no point in making all of the critical decisions now. Make different prototypes with different designs/architecture so you have options to weigh. Don’t constrain yourself right away without having enough knowledge to determine those constraints. Making constraining decisions at the beginning without sufficient knowledge is premature, and those decisions can turn out to be the wrong decisions later on. Also, holding design to wait on optimal characteristics to be determined allows no actual progress on design to happen. Having a rough prototype that you can revise later to match optimal characteristics gives you a head start.

Division/System Requirements

High Level Flowchart:

2024-2026 Requirements Sheet

Design Brainstorm

Daybreak Plan:

System

Aeroshell

What is broken/insufficient?:

What repair options exist?:

How much time do you believe each option will take?:

What level of involvement could new members have in these processes?:

What is your overall outlook on the feasibility of us repairing daybreak with such a capacity that we could pass scrutineering in FSGP 2025?:

Fergo

What is broken/insufficient?:

What repair options exist?:

How much time do you believe each option will take?:

What level of involvement could new members have in these processes?:

What is your overall outlook on the feasibility of us repairing daybreak with such a capacity that we could pass scrutineering in FSGP 2025?:

Dynamics

What is broken/insufficient?:

What repair options exist?:

How much time do you believe each option will take?:

What level of involvement could new members have in these processes?:

What is your overall outlook on the feasibility of us repairing daybreak with such a capacity that we could pass scrutineering in FSGP 2025?:

Emech

What is broken/insufficient?:

What repair options exist?:

How much time do you believe each option will take?:

What level of involvement could new members have in these processes?:

What is your overall outlook on the feasibility of us repairing daybreak with such a capacity that we could pass scrutineering in FSGP 2025?:

Trial Workday Plan:

System

Plans

Aeroshell

Fergo

Dynamics

Emech

✅ Action items

  •  

⤴ Decisions

  • No labels