\uD83D\uDDD3 Date
\uD83D\uDC65 Participants
\uD83E\uDD45 Goals
Individual System Requirements
Research/testing Checkpoint Review
Design Brainstorm and Development
Daybreak Plan
Trial Workday Plans
\uD83D\uDDE3 Discussion topics
Item | Notes |
---|---|
Preliminary Design Strategy |
There is no point in making all of the critical decisions now. Make different prototypes with different designs/architecture so you have options to weigh. Don’t constrain yourself right away without having enough knowledge to determine those constraints. Making constraining decisions at the beginning without sufficient knowledge is premature, and those decisions can turn out to be the wrong decisions later on. Also, holding design to wait on optimal characteristics to be determined allows no actual progress on design to happen. Having a rough prototype that you can revise later to match optimal characteristics gives you a head start. |
Division/System Requirements | High Level Flowchart: 2024-2026 Requirements Sheet |
Design Brainstorm | Two probable designs so far:
|
Daybreak Plan:
System | |
---|---|
Aeroshell | What is broken/insufficient?: What repair options exist?: How much time do you believe each option will take?: What level of involvement could new members have in these processes?: What is your overall outlook on the feasibility of us repairing daybreak with such a capacity that we could pass scrutineering in FSGP 2025?: |
Fergo | What is broken/insufficient?: What repair options exist?: How much time do you believe each option will take?: What level of involvement could new members have in these processes?: What is your overall outlook on the feasibility of us repairing daybreak with such a capacity that we could pass scrutineering in FSGP 2025?: |
Dynamics | What is broken/insufficient?: What repair options exist?: How much time do you believe each option will take?: What level of involvement could new members have in these processes?: What is your overall outlook on the feasibility of us repairing daybreak with such a capacity that we could pass scrutineering in FSGP 2025?: |
Emech | What is broken/insufficient?: What repair options exist?: How much time do you believe each option will take?: What level of involvement could new members have in these processes?: What is your overall outlook on the feasibility of us repairing daybreak with such a capacity that we could pass scrutineering in FSGP 2025?: |
Trial Workday Plan:
System | Plans |
---|---|
Aeroshell | |
Fergo | |
Dynamics | |
Emech |
✅ Action items
- Jason Heston Aidan Hodgin Continue practicing surface modeling in Solidworks
- Noah Hickman Joshua Miksits Start modeling a basic frame (make it adjustable by using reference sketches, global variables, and equations); look at roll cage designs
- Harshit Dalmia Start making a skeleton reference sketch for dynamics (make it adjustable by using reference sketches, global variables, and equations)
- Parthiv Shah Continue working on new pack/box design - refine design; come up with replacement enclosure for Daybreak