\uD83D\uDDD3 Date

\uD83D\uDC65 Participants

\uD83E\uDD45 Goals

  • Individual System Requirements

  • Research/testing Checkpoint Review

  • Design Brainstorm and Development?

  • Daybreak Plan

  • Trial Workday Plans

\uD83D\uDDE3 Discussion topics

Daybreak Plan:

  • won’t have a dedicated discussion, just a check in on progress

System

Aeroshell

What is broken/insufficient?:

What repair options exist?:

How much time do you believe each option will take?:

What level of involvement could new members have in these processes?:

What is your overall outlook on the feasibility of us repairing daybreak with such a capacity that we could pass scrutineering in FSGP 2025?:

Fergo

What is broken/insufficient?:

  • Fix some of the roll cage welds (if possible)

  • Roll cage needs to be painted

  • Brake light broken

  • Steering wheel (controls buttons and wiring is fucked)

  • Seat?

What repair options exist?:

  • weld frame : (

  • paint frame : (

  • get new brake light

  • Make new steering wheel

  • Idfk about seat, need to look into it

How much time do you believe each option will take?:

What level of involvement could new members have in these processes?:

What is your overall outlook on the feasibility of us repairing daybreak with such a capacity that we could pass scrutineering in FSGP 2025?:

Dynamics

What is broken/insufficient?:

  • Lower steering column

  • Wishbone lengths

What repair options exist?:

  • Remake wishbones

How much time do you believe each option will take?:

What level of involvement could new members have in these processes?:

What is your overall outlook on the feasibility of us repairing daybreak with such a capacity that we could pass scrutineering in FSGP 2025?:

Emech

What is broken/insufficient?:

What repair options exist?:

How much time do you believe each option will take?:

What level of involvement could new members have in these processes?:

What is your overall outlook on the feasibility of us repairing daybreak with such a capacity that we could pass scrutineering in FSGP 2025?:

Trial Workday Plan:

  • What if someone wants to do two systems at once?

  • What materials do we need for your plans?

  • Logistics: how to go from one system to another, do you need the car for your plans, etc.?

System

Plans

Aeroshell

Fergo

Dynamics

Emech

✅ Action items

  • Jason Heston Aidan Hodgin Continue practicing surface modeling in Solidworks
  • Noah Hickman Joshua Miksits Start modeling a basic frame (make it adjustable by using reference sketches, global variables, and equations); look at roll cage designs
  • Harshit Dalmia Start making a skeleton reference sketch for dynamics (make it adjustable by using reference sketches, global variables, and equations)
  • Parthiv Shah Continue working on new pack/box design - refine design; come up with replacement enclosure for Daybreak

⤴ Decisions