Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

\uD83D\uDDD3 Date

\uD83D\uDC65 Participants

\uD83E\uDD45 Goals

  • SRR Prep

  • Onboarding (machine shop training, Ansys licenses, new member projects)

  • Workday plans

\uD83D\uDDE3 Discussion topics

Item

Notes

Announcements

  • Action items I set from last week’s meeting:

    • Have week-by-week timelines in the daybreak gantt chart

    • Have material ready to set a track width, wheelbase, and CoG location

    • Have draft research proposal by EOD 9/28 - Advait

    • Create a more detailed plan (roughly in general detail, doesn’t have to be hyper-specific) for onboarding over the next 5 weeks

  • SRR is THIS SUNDAY starting @ 12pm

    • trial run for dynamics, aeroshell, and emech is on Friday evening

Machine Shop Certification

Please fill this excel sheet out with all members that need to be machine shop certified. Only include people that are priority

https://utexas.sharepoint.com/:x:/r/sites/ENGR-LonghornRacing/_layouts/15/Doc.aspx?sourcedoc=%7BD88CEAD1-E993-46BF-B9AF-D0F19DE82301%7D&file=Machine%20Shop%20Cert%20Initial%20Count.xlsx&action=default&mobileredirect=true

Ansys

Please ask members who need access to Ansys to fill this form out:

https://forms.office.com/r/cmPNL0fC8M

Dynamics:

Aeroshell:

Body:

Emech:

What is something you struggled with this week? What is something you are proud of this week?

  • SRR Deadlines

  • Plan for workday was good and people liked it (even though one person felt like it was a bit repatatvie)

 

Workday Review

everyone seems to be engaged

got feedback form our form from one person saying that it was interesting and engaging and another person said it was repetitive and a boring presentation what an asshole

Next Workday Plan

Suspension:

Steerin: Draw the bicycle model for using the previous cars dimensions in solidworks, correlate model with ackerman calculations and correlate ackerman angles with physical steering geometry (4 bar probably, maybe 6 bar)

Unsprun: Spend 3 hours on just going through unsprung together dimensions and finding out all the dependencies. Then go about who needs to do what design.

New Members:

Old Members:

New Members:

Old Members:

New Members:

Old Members:

New Member Projects

suspension: reference sketch from vsusp control arm outputs using parameters

1 member : Rear trailing arm x unsprung member

1 member : Composite components collab w composites, > interest in load analysis, 

1 member :  Daybreak

1 member : Daybreak

Unsprung:

1 person rear swing arm

Sami working on Hub + Spindle design

1 person working on hub and spindle separate

Steven + 1 person working on upright

steering: Draw the bicycle model for using the previous cars dimensions in solidworks, correlate model with ackerman calculations

Daybreak Progress?

nun.

Questions subsystems want to ask:

can one of my members work w composites as a main task this sem? @advait

at some point can we / do we want to do a mech joint lecture practice on FEA on a part or some shit - maybe noah led or smth

same for master modeling from esther perhaps?

✅ Action items

  •  

⤴ Decisions

  • No labels