Goals
SRR Prep
Onboarding (machine shop training, Ansys licenses, new member projects)
Workday plans
Discussion topics
Item | Notes |
---|---|
Announcements |
|
Machine Shop Certification | Please fill this excel sheet out with all members that need to be machine shop certified. Only include people that are priority (Tuesday night) |
Ansys | Please ask members who need access to Ansys to fill this form out: |
SRR Takeaways |
|
| Dynamics: | Aeroshell: | Body: | Emech: |
---|---|---|---|---|
What is something you struggled with this week? What is something you are proud of this week? |
|
|
|
|
Workday Review | everyone seems to be engaged got feedback form our form from one person saying that it was interesting |
| new recruits were excited and engaged (literally couldn’t get them to go to lunch, they were locked into SolidWorks) real work starts next week, hopefully they’ll still be excited and engaged |
|
Next Workday Plan | Suspension: Starter project for all of them is to make a front suspension:
1 member : Rear trailing arm x unsprung member 1 member : Composite components collab w composites, > interest in load analysis, 1 member : Daybreak - 1 member : Daybreak - Does anyone want to focus on manufacturing Steering: Draw the bicycle model for using the previous cars dimensions in solidworks, correlate model with ackerman calculations and correlate ackerman angles with physical steering geometry (4 bar probably, maybe 6 bar) Unsprun: Spend 3 hours on just going through unsprung together dimensions and finding out all the dependencies. Then go about who needs to do what design. | Aerodynamics:
Composites:
| Overall:
New Members: https://docs.google.com/document/d/1gCezsoceA3uDwGNFBQdVpyVjkoLY6drBHVTPxcQxkbU/edit Old Members:
| New Members:
Old Members:
|
New Member Projects (Two types of projects: starter project will actually go on the car, onboarding projects can be general learning experience) | suspension: reference sketch from vsusp control arm outputs using parameters 1 member : Rear trailing arm x unsprung member 1 member : Composite components collab w composites, > interest in load analysis, 1 member : Daybreak 1 member : Daybreak Unsprung: 1 person rear swing arm Sami working on Hub + Spindle design 1 person working on hub and spindle separate Steven + 1 person working on upright steering: Draw the bicycle model for using the previous cars dimensions in solidworks, correlate model with ackerman calculations
| Composites: Push rods and control arms: Aniq, Javi, and Akhilesh
Aerodynamics:
| Frame:
Ergo
| Wire Harnessing:
Cooling:
Enclosures:
|
Daybreak Progress? | nun. Need to work on timeline. Working on CG and dynamics characgteristics.
| 1/3 research proposals are done. Working in the others. 3 members per 3 of the research topics. Working with other composites teams for research. | Pedal Box fixes in the works (pedal travel, brake light potentiometer, etc.) Steering Wheel design in the works Frame will frame soon? |
|
Questions subsystems want to ask: | can one of my members work w composites as a main task this sem? @advait at some point can we / do we want to do a mech joint lecture practice on FEA on a part or some shit - maybe noah led or smth
same for master modeling from esther perhaps? |
| nah |
|
Action items
Decisions
- We are taking the frame out of the shell on Oct 12, 2024