2024-10-16 Electrical Leads Meeting

Attendees

  • @Pratyush Patra

  • @Lakshay Gupta

  • @Parthiv Shah

  • @Pablo Romero

  • @Diya Rajon

  • @Ishan Deshpande

  • @Michael Mohn

Goals

  • Design Review

  • Motor

  • Workday plans

  • Timelines

  • Purchasing

Discussion Agenda

Time

Item

Who

Notes

Time

Item

Who

Notes

 

Design Review

@Pratyush Patra

  • Dry Run- Friday at 3

  • Presentation Sunday at 4

 

Motor

@Diya Rajon

  • Step 1 is power supply testing

  • Battery needs to be fixed regardless, end of week

  • Current plan is to test motor on ground with brakes fully engaged and wheel ratchet strap

 

Workday

 

Workday

  • BPS

    • Kadhir- ADC Mux board, finished

    • Abigail- Filtering for voltage measurement

    • Phoenix- PWM, Block diagram done, Header done, Reviewable C file EOD

    • Nathan- busy, choose an ADC for Amperes

    • Clark- Pick ADC mux for Leader by EOD

    • Aneri- Rewievable C file EOD for SPI

    • Kartik- SQL silly data, Figure out requirements of project

    • Michael- Needs to be reviewed, Figure out Michael needs to do

  • Pablo

    • New members almost done

    • Matthew- Parts selected, finishing schematic

    • Jim- Structure set up,

    • Lance- RL framework integrated w/ pychrono

  • Diya(Go up to pickle)

    • Oscar- Goated motor stuff(config parameters)

    • Eliana- Pedal Board, Requirements

    • Mika- Daybreak dashboard, PR open, dialed

    • Lucy- Working on lighting board, reqs done before workday, Start schematic

    • Maddie, Krish- Check if schematic finished

    • Jiwoo and Arnav- Test file for motor, Rewriting send tritium

    • Akshay- Board to interface with Pi, reqs done EOD

  • Frank the Tank Li

    • Carolyn and Frank- Open PR, Start layout?

    • Changxu and Watts- Schematic basically done

    • Jacob and Tony- Combine schematics, PR done EOD and start schematic

    • Ravi- Schematic + Layout, Address changes and open new PR by EOD

    • Twins- Silly thing

  • Andrew

    • Tanya- Testing i2c noise w/ motor, Tanya and Tong going up to test the Array, Fixing array plan by EOD

    • Aarav- BSP_ADC, Making good progress, Try and finish c file

    • Erika- Started Voltage/Current sense for MPPT, testing board will get done. Figure out ADC choice by EOD.

    • Aleena- Same as Erika, looking at Matthew’s sims, Look at PSpice to simulate

    • Isaac- Same as Erika

    • Praneel- Address software diagram comments

    • Nikhil- Array sim for shaded cells

    • Tong- Going up to assess array damage, Talk to Advaith about array cooling

    • Roy- Web socket(422C) for Eclipse 0.4

    • Connor- SQL database, Done, Gonna talk to Kartik and use the database for Curvetracer

    • Andrew- Talk to members, Talk to Prat

 

Timeline

 

  • High level integration dates are as stated

 

Purchasing

 

  • MPPTs check in

  • XBee check in

  • Buy component organizers

  • Mouser OPS goated

  • Figuring out JLCPCB stuff

  • Find oscilloscope

Discussion Notes

  • Action items-

    • Talk to Philip about mechanical data reqs

    • Talk to Matthew about Leader schematic progress

    • Talk about lighting and pedal

    • Figure out Controls Leader Rework review status

    • Jim

    • Talk to Erika, Aleena, and Isaac

    • Talk about op amp mosfet stuff