2024-01-28 Workday Log

NameWhat They Did
Philip


Suspension
Andrew
  • got feedback from jacob/nathan on wishbone manufacturing plan
  • trained dyn ppl on manual mill
Kadhir


Kayla
Unsprung
Gerard
  • continued to prepare to manufacture axles
    • addressed all of the remaining problems with the manufacturing plan
    • finalized dimensions and tolerances
    • helped measure inner diameter of bearings and hubs
    • watched single point thread cutting videos
    • got feedback from Jacob and Nathan on plan
Steven
Sami
  • Face the wishbones down to .5" → Kadhir later took over. 
  • Discussed the manufacturing plan for uprights with Nathan, Jacob, and Harshit. 
  • Learned how to use the Manual mill. 
Harshit
  • Read Mathew's design guide about unsprung
  • Got feedback from Jacob/Nathan on Uprights manufacturing plan
Steering
Luis
Anh
KatyN/A
Evan
Frame
Kaitlyn
Josh
  • Learned how to use manual mill and roughed aluminum steering stopper plate
Noah
  • Trained on the manual mill by Andrew where I began the fabrication of the steering stop plate