Build Lab Tool Checkout Policy

Build Lab equipment may be checked out only if such equipment is necessary to carry out assigned classroom or studio projects. In all instances in which equipment is removed, the individual removing it must assume pecuniary responsibility unless he or she is otherwise specifically relieved of such responsibility in writing by Build Lab Staff.

Tools checked out from the Build Lab are subject to the following terms and conditions:

1)  Use:  The Build Lab loans equipment to Faculty, Staff and Students (Borrowers) of UT Austin’s School of Architecture, only.  Borrowers are responsible for the proper use of items they check out.  Build Lab staff can instruct you on this if asked.

2)  Duration of loan:  All equipment must be returned by the date noted on the check-out form and in good working condition.  The loan of tools is for 24 hours, maximum.  Failure to do so will result in fines and penalties as outlined in section 3, below.

3)  Fines and Penalties:  Borrowers are responsible for any and all applicable fines associated with borrowing equipment from the Build Lab as outlined below:

a)  Fines are assessed for lost or broken equipment returned, based upon the item’s current replacement value, plus late fees as appropriate.

b)  Items not returned after 5 days will result in the following fines and penalties:

i)  A $20 late fee, plus

ii)  Replacement costs for replacement the equipment as outlined above, plus

iii)  A bar will be placed on the borrower’s academic record.